Manuka Health NZ were wanting to increase production capacity in a days shift without disruption to their current production.
To do so they needed to modify their existing filler from a two head to a four head filler. A new filler frame with additional parts was manufactured while production continued. A one week window was then allocated to convert the existing two head machine to a four head machine.
By using some of the existing filling machine components Hunter Filling were able to save considerable cost on the price of the new four head machine and the new filler met and exceeded production throughput requirements.